Project Renovation: Before & After - Master Bath

...drum roll, please!....

I present, my master bath before:

A word about the before. I really loved this bathroom. Like, really loved. I wanted to keep everything and just spruce it up a bit with new paint & wainscoting, but when it came down to the renovation of the rest of house, it was obvious several things had to happen. It was almost like a domino-effect {another reason to fully plan out ALL your renovations before work starts so you don't have crazy change-orders. Contractors love & hate change orders. They make more money on them, but it usually involves more time and effort. Both are bad things for the holder of the checkbook}. I'm guessing the house only had one bathroom when it was built. Naturally, the bathroom had it's door in the hallway so everyone had access. I think the 2nd bath was added some time later, also with access from the hallway. This resulted in 2 bathroom doors about 10 feet from one another. Since I was recapturing kitchen space by moving the hall bath and making it an official "guest bath", it was only logical to close off the door into the back bath and create a Master Bathroom. Hel-lo Master Suite! Woo hoo!

(PS. Don't you just love the old yellow walls with pink trim? So groovy... Not.)

--

Because of where we were putting the new doorway and the space constraints, I was super sad that the awesome built-in cabinets had to be removed. I was hoping that I'd be able to save and relocate them to the other wall. I was informed after demo {which I kick myself for not being there and helping/supervising} that it was too damaged in the removal process to save. {my totally irrational subconscious was stamping my feet like a 3 year old, screaming "those lazy, oafish demo guys!! They tore it out because they didn't want to take the extra #$*%!* effort to remove it gently!!!!! AAHHHHHH!!!!"
Of course, I have no evidence of this.}

Also, the beautiful porcelain hex tiles had to be ripped out because there was a huge crack in the middle of the floor {I'm assuming from an earthquake or the house settling}. Also with the relocation of toilet, sink and cabinets, there were several holes that would be difficult to match new tiles & grout without looking patchy. I was also hoping to turn the original cast iron tub into a tub-shower - as much as I would love to take baths every day, it's not super practical. Naturally, with creating a shower, I would need a tile surround to prevent water damage & flooding while I took a shower in said tub-shower. Small detail. All said and done, where I thought I'd need minimal work, I ended up with a totally gutted bathroom.

*sigh*

So, work continued while I tried frantically to find tile, a new toilet {I was also planning on keeping the two original toilets, but on closer inspection and some rational thinking, they were both quite gross}, a medicine cabinet, a new sink cabinet, and fixtures to tie it all together into a cohesive unit.

A win for me: I managed to save my original tub. My contractor thought I should get a new tub because the original one had some rust spots around the drain and faucet area. Really not that bad in my opinion... it's just so cute and has a really pretty curve on the sides. I couldn't bear to get rid of it {besides! It's ORIGINAL and CAST IRON. I mean, come-on. Not only that, but a new cast iron tub is at least $1200! I'm not a fan of acrylic tubs. Cheaper yes, but no plastic tubs in my house, thank you very much}. After my insisting, my contractor found a little old man who reglazed it for about $250 and it looks brand-spankin' new. Winning!

So, without further ado, here's my new Master Bath!